top of page
Search

The Real Cost of Excavator Downtime (And How Used OEM Parts Save You a Fortune)

  • Writer: RALPH COPE
    RALPH COPE
  • 4 hours ago
  • 4 min read
ree

A Hard-Hitting, South African, Contractor-to-Contractor Reality Check

Let’s cut the crap.


Every contractor in South Africa thinks they understand the cost of downtime… until their excavator dies in the middle of a job, the client starts phoning every hour, and their crew stands around scratching their balls while billable hours burn like tinder.


Most guys only count the price of the replacement part.R5,000 here. R12,000 there.


Cute.


But that’s not the real cost.Not even close.


The real cost of downtime is the compound financial beating you take from project delays, rental penalties, wasted labour, missed deadlines, lost trust, and the joy of telling your client “Sorry, we’re running behind.”


So let’s break it down properly — like grown men who run actual businesses — and then I’ll show you why used OEM excavator parts can save your bacon more times than you realise.


SECTION 1: Downtime in South Africa Is a Different Beast

If you were in Europe or the US, downtime is annoying.


In South Africa?Downtime is a career-threatening disaster.


You’re up against:

  • Eskom load shedding messing up your timeline

  • Record-high fuel costs

  • Traffic fines the government prints like confetti

  • Clients who want miracles for budgets that barely cover toilet paper

  • Labour that still needs to be paid, even when they stand around on their phones

  • Replacement parts that take days to arrive because the courier is “still in Jet Park”

When your excavator goes down here, you're not losing money — you’re bleeding out.


SECTION 2: The Real Rand Value of Downtime (No Sugarcoating)

Most contractors massively underestimate this number.

Let’s show you how it actually adds up.


1. Labour Cost: R3,000 – R12,000 per day

Your operator, site foreman, general workers — all sitting around. They still get paid.

Even if your excavator is sleeping peacefully like a dead buffalo.


2. Machine Hire Loss: R8,000 – R25,000 per day

If that excavator is supposed to be earning money on a daily hire, that income is GONE.

Forever.Never coming back.Dead.


3. Project Delay Penalties: R5,000 – R50,000 depending on contract

Big clients?They don’t play.

Gov contracts?They’ll eat you alive.


4. Fuel and Transport Waste: R2,000 – R10,000

Because moving a broken excavator is always a mission:

  • lowbed required

  • wasted fuel

  • wasted time

  • wasted sanity


5. Client Confidence Damage: Priceless (but devastating)

Once your client thinks you’re unreliable, that’s it —good luck getting the next contract.


Add it all up?

A single shitty breakdown can hammer you R20,000 – R100,000 per day.

And most breakdowns last three days minimum if you rely on new parts.

Do the maths:


**Total downtime cost for 3 days:

R60,000 – R300,000+**

All because one part failed.


SECTION 3: Why Downtime Usually Happens at the Worst Possible Time

Because machines don’t care about your schedule.


In South Africa, breakdowns tend to happen:

  • on Fridays

  • during rain

  • right after payday

  • when you’ve just told your client “we’re on track”

  • or the moment you post a progress pic on WhatsApp


Call it machine karma.


But there’s one thing that makes downtime go from annoying to financial murder:


Waiting days for a NEW replacement OEM part.

Anyone who has ever stood at the parts counter knows the smile the guy gives you:

“We’ve got stock. It’s in Durban. Should arrive Monday… hopefully.”

SECTION 4: Why USED OEM Parts Are Your Secret Weapon Against Downtime

Here’s the punchline:


The fastest way to stop downtime from destroying your business is to use USED OEM parts.


Not cheap aftermarket junk.Not patched-together Frankenstein parts.Not “my cousin knows a guy” specials.


I’m talking about proper OEM components that were:

  • removed from a working machine

  • inspected

  • pressure-tested (for hydraulics)

  • ready TODAY

  • and cost 40%–70% less than new

Let’s break down why used OEM is the smart play.


1. They’re Available Immediately — No Waiting for Stock

New parts take days.Sometimes weeks.


Used OEM?You can pick them up today, get them installed, and have your excavator back in the dirt tomorrow morning.


Downtime goes from 3 days to 12 hours.


That alone saves you tens of thousands of rands.


2. OEM Quality Is OEM Quality — Even If It’s Used

OEM parts are designed to:

  • fit perfectly

  • cope with SA dust, rock, heat

  • last thousands of hours

  • outperform aftermarket alternatives, every time


Aftermarket parts?

Let’s be honest:You’re basically gambling your entire job site on China’s quality control.


3. They Cost WAY Less — Without Sacrificing Performance

Here’s the beauty:

  • Final drives: Save R40k–R150k

  • Hydraulic pumps: Save R20k–R80k

  • Boom cylinders: Save R10k–R30k

  • Swing motors: Save R15k–R50k

  • Engine components: Massive savings


Contractors say they “can’t afford” OEM.

The truth?

Most can’t afford downtime.


SECTION 5: The REAL Comparison — New OEM vs Used OEM vs Cheap Aftermarket

Part Type

Cost

Availability

Lifespan

Downtime Impact

New OEM

Very expensive

1–5 days

Excellent

High downtime

Used OEM

40–70% cheaper

Immediate

Excellent

Minimal downtime

Cheap Aftermarket

Cheap upfront

Quick-ish

Terrible

Usually causes more downtime later

Cheap aftermarket parts are like cheap whiskey:

Feels like a bargain until you drink itand then you realise it was a horrible decision.


SECTION 6: The Hidden Bonus — Used OEM Parts Reduce Risk

When you use used OEM parts, you avoid:

  • misfitting components

  • premature failures

  • overheating issues

  • bad tolerances

  • warranty voids

  • unbalanced hydraulic loads

  • random weird noises you pretend not to hear

Plus, you’re working with real excavator parts designed by the actual manufacturer — not some mystery metal.


SECTION 7: Vikfin’s Role in Keeping SA Contractors Alive


Here’s what makes Vikfin different from the usual “strip a machine and pray” suppliers:

  • We strip with respect (yes, that’s a thing)

  • We test properly

  • We store correctly

  • We know which parts matter most

  • We deliver nationwide

  • We understand downtime because we work with contractors daily

You’re not buying a part.You’re buying time savings, profit protection, and stress reduction.


SECTION 8: Final Word — Downtime Doesn’t Have to Be a Financial Ass-Kicking

Downtime kills profits.

It kills timelines.

It kills client relationships.


But the good news?You can avoid 70% of breakdown-related financial losses simply by choosing:

  • Used OEM over new OEM (because it’s faster + cheaper)

  • Used OEM over aftermarket (because it actually works)


South African contractors who switch to used OEM parts don’t just save money —they survive longer, scale faster, and stay competitive.


Downtime is expensive.Your solution doesn’t have to be.

 
 
 

Workshop Locations

Durban: Cato Ridge

Johannesburg: Fairleads, Benoni

Vikfin logo

Telephone/WhatsApp

083 639 1982 (Justin Cope) - Durban

071 351 9750 (Ralph Cope) - Johannesburg

©2019 by Vikfin (PTY) Ltd. 

bottom of page